Thursday, June 11, 2009

Thursday 20090611

Only one more section of siding to put up, finish repairing the fascia and shingle moulding, and replace some cracked trim boards and the exterior will be finished. Oh, and the craftsman trim brackets for the gable apexes. The back steps were started today including the hand rail for the retaining wall out back.



You can see the new copper flashing along the edge of the master deck. There is a slight problem with post heights on the front step assembly where the steps rise from the ground to the landing. At first I thought it was an optical illusion, but when I measured, there were 1.5 inch differences in two of the posts and other mismatches.

Yes! The master deck membrane was installed today.

No comments: