Outstanding day! Almost all the decking is in place. All that is left is about five boards where the pump jack is still in place on the side deck.




The shower walls in bath #2 (downstairs) are finally being framed and the plumber installed the valve and head stub-out.

Lots more wiring was installed on the second floor including standard, GFI, and 240v circuits.

The shower head stub-out for the master shower was installed in the wrong location. But hey, almost all the rough-in plumbing is in now.