Friday, May 29, 2009

Friday 20090529

Finally, both the electrical and the plumbing rough-in inspections are complete! The exterior service panels have been installed.


The exterior lighting and receptacle blocks are in place and wired.


The soffit material had to be removed from the side door overhang to mount the can light. Since we cannot get the soffit material in large enough pieces, I presume they will put the 1x6 v-groove bead-board up like is going on the front porch ceiling.

Sconce blocking has been installed at both the front door and the back door.

Light and receptacle blocking on the master deck has also been installed.


Plumbing lines are still holding max pressure.