We're on a roll again! Yesterday had to be marked up as pretty much a rain day. Today, more shakes and trim were installed on the east side. A little disappointed that the door from the downstairs bedroom to the side deck is not hung correctly. Something is either not plumb, square, or level. I'm sure they'll get back around to correcting it sometime. Eddie Blake of AB Blake Electrical Contracting will begin the electrical rough-in on Monday!
Friday, May 15, 2009
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment