Well, at least the framing crew is replacing the misaligned shingles on the shed dormer, now if they will only realign the shingles on the main gable so they don't drop about 1 inch in a 20 foot run.
Lots of great progress in pulling wire on the second floor and most of the plumbing routes have been sealed. The two shower pan membranes were installed today.
Thursday, May 21, 2009
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment