The exterior lighting and receptacle blocks are in place and wired.
Friday, May 29, 2009
Friday 20090529
Finally, both the electrical and the plumbing rough-in inspections are complete! The exterior service panels have been installed.
The exterior lighting and receptacle blocks are in place and wired.
The exterior lighting and receptacle blocks are in place and wired.
Thursday, May 28, 2009
Thursday 20090528
The framing crew installed mounting blocks for exterior lighting today. The plumbing above-ground rough-in inspection passed yesterday.
Tuesday, May 26, 2009
Tuesday 20090526
After a long holiday weekend, we get 2.71 inches of rain today. In spite of this, the electricians had a good day pulling more wire. I don't know how they will be able to pack all this into the service box.
We are disappointed that the back door still does not have the board under the threshold and hope that is the only reason water continues to pour in under it when it rains.
Friday, May 22, 2009
Friday 20090522
Well, if the county offices had been open today, the plumber would have called for a rough-in inspection for next Tuesday, but they were closed due to mandatory furlough. We should be getting both the electrical and the plumbing inspections sometime next week. We're keeping our fingers crossed. The framing crew re-did the siding on the east shed dormer wall so it aligns with the rear of the house.
Thursday, May 21, 2009
Thursday 20090521
Well, at least the framing crew is replacing the misaligned shingles on the shed dormer, now if they will only realign the shingles on the main gable so they don't drop about 1 inch in a 20 foot run.
Lots of great progress in pulling wire on the second floor and most of the plumbing routes have been sealed. The two shower pan membranes were installed today.
Lots of great progress in pulling wire on the second floor and most of the plumbing routes have been sealed. The two shower pan membranes were installed today.
Wednesday, May 20, 2009
Wednesday 20090520
Great day for both plumbing and electrical. We were so excited to see my OUTDOOR SHOWER!
Hose bib.
Supply line from well pump.
Hose bib.
Supply line from well pump.
Shower in bathroom #2 and pan membrane.
Tuesday, May 19, 2009
Tuesday 20090519
Outstanding day! Almost all the decking is in place. All that is left is about five boards where the pump jack is still in place on the side deck.
Monday, May 18, 2009
Monday 20090518
Wooohoooo! Eddie Blake's crew (A B Blake Electrical Contractor) started the electrical rough-in. They started on the second floor and worked down to the first floor putting in the receptacle, switch, and fixture boxes and the can lights. Then they began pulling wire on the second floor.
Saturday 20090516
Intermediate post was added to back deck and decking was applied to side and back deck up to the southwest corner. Here they will continue decking along the side deck after the scaffold is removed.
Friday, May 15, 2009
Friday 20090515
We're on a roll again! Yesterday had to be marked up as pretty much a rain day. Today, more shakes and trim were installed on the east side. A little disappointed that the door from the downstairs bedroom to the side deck is not hung correctly. Something is either not plumb, square, or level. I'm sure they'll get back around to correcting it sometime. Eddie Blake of AB Blake Electrical Contracting will begin the electrical rough-in on Monday!