The pace is picking up somewhat. The ground level plumbing passed inspection today as well as the sheathing. There are a few bolts that need to be reinstalled to get the foundation pilings to pass inspection . The parking slab can now be poured.
The vapor barrier was applied to some of the house today.
Also, the roof returns and overhang boxing have been started on one side of the house.