Wednesday, January 14, 2009

Demo Day 2

Today was the second day of demolition and removal of debris. By the afternoon, not much was left and the operator began to level out the remaining dirt.


The retaining wall around the driveway was the last of the house and shed that needed to be removed.



Once, the wall was down, he continued to level out the surface.


Barbara worked hard to salvage some camellias and sasanqua bushes.

Before shutting down, the operator pulled up a section of the asphalt parking pad.
Still just a little more to go before demo is complete and the county can inspect the site.

1 comment:

jl34950@aol.com said...

I am sure that Barbara managed to salvage what she wanted....not taking too long to get things ready for the new place....