- One of the HVAC outside units was installed along with several vents
- The cooktop hood was installed
- Barbara and I put the pantry tub sink together (Sunday afternoon)
- All the registers and return vent grills were installed
- Both thermostats were installed
- The painters filled most of the finishing nail holes in the interior trim
Monday, August 31, 2009
Monday 20090831
Not bad for a rainy day:
Thursday, August 27, 2009
Thursday 20090827
Interior trim is done for now:
- Front door from old house is now the pantry door
- Stairs and rails are in
- All chair rails are in
- The equipment boxes are installed on either side of the fireplace
Wednesday, August 26, 2009
Wednesday 20090826
Leaving for Morehead City in a few minutes for the Coastal Resources Commission meeting so I went by the house a little early. We are getting real close now.
- Last gable bracket is up
- Mirrors in bath #2 are up
- Chair rail in dining room and vestibule is up
- Crown molding around top of appliance cabinets is up
- All the wainscoting in bath #3 is up
Tuesday, August 25, 2009
Tuesday 20090825
Pretty good work done today.
- upstairs stairwell hand rail completed
- TV "box" set
- Linen closet "box" set
- Newel at bottom of steps set (incorrectly with regard to how we were told)
- Barbara and I tried the mirrors out for the master and #3 baths
- Atlantic glass came and measured for the downstairs bath #2 mirrors today
- Mantle was built today
Monday, August 24, 2009
Monday 20090824
It's been a couple of days since we were able to get photos and post, but lots has been done.
- all the tile work is finished, including the fireplace surround
- the stair treads and risers are in
- the hand rail along the stairwell upstairs is in
- we might change the master bath paint color to a brown
- the wainscoting is finished in bath #3
- almost all the exterior trim is finished
Subscribe to: