What a great week! All the cabinets are in except for some trim, soffit, and valances. Kitchen:
Friday, July 31, 2009
Thursday, July 30, 2009
Wednesday, July 29, 2009
Wednesday 20090729
Tuesday, July 28, 2009
Tuesday 20090728
Sorry for the lack of posts since last week, but not much has been done other than prepping the two shower floors and walls for tile. However, the cabinets were delivered from the warehouse today and they are beautiful. They are white painted maple in the kitchen and baths 2&3, but natural maple in the master bath. We went to the granite fabricator's plant today to "verify" the two slabs of verde peacock that will be used for the kitchen and bath 2.
Wednesday, July 22, 2009
Wednesday 20090722
OK! First coats of wall colors are up in the kitchen and dining room,...
...the living room,...
Tuesday, July 21, 2009
Tuesday 20090721
The hardwood was completed today. All that was left was some of the girls room, some of the master bedroom, and the sitting room.
Monday, July 20, 2009
Monday 20090720
The hardwood installers came back after lunch to day and finished up the second floor hall, almost all the master bedroom, and layed out most of the girls' bedroom (bedroom 3) but it appears they are a couple of bundles of wood short.
Sunday, July 19, 2009
Saturday 20090718
The hardwood floor installers came back on Saturday and began laying the oak upstairs. Her is Barbara's sewing room and our master closet (one room).
This is looking down the hall into the master bedroom.
This is the master bedroom and the color on the far right is the color the walls will be.
This is looking down the hall into the master bedroom.
This is the master bedroom and the color on the far right is the color the walls will be.
Saturday, July 18, 2009
Friday 20090717